Replacement of High-Pressure Boilers and Sterilizers
Batska consulting orchestrated NYU Langone Hospital's upgrade to its heating infrastucture with the intricate and meticulous replacement of three outdated and insufficient high-pressure steam boilers, with two modern, skid-mounted 50HP high pressure steam boilers, while not interrupitng the building's existing hot water and heating demands. This included the detailed coordination of the installation of a new associated water tank, piping, valves, and electrcial connections within the existing boiler plant, so that the existing system could stil support the hospital's needs while also preparing the upgraded heating infrastructure. The transformation delivers a robust, future ready steam producing system prepared to grow with the hospital's increasing demands.
